Skip to main content

Field Manual

Outdoor Living Standards

The complete Restrepo standard for outdoor living technology infrastructure. Covers distributed audio zoning, IP-rated hardware selection, speaker placement geometry, lighting control pre-wire, and the weatherproofing requirements for all outdoor enclosures and conduit runs.

What This Standard Covers

  • Speaker placement geometry by outdoor zone type: pool deck, covered porch, open terrace
  • IP and weather resistance ratings required for each outdoor component and enclosure
  • Distributed audio wiring topology from interior equipment rack to each outdoor zone
  • Outdoor lighting control conduit and low-voltage wiring requirements by zone
  • Video distribution requirements for outdoor displays and projector housings
  • Conduit fill, burial depth, and waterproof termination standards for all outdoor runs

Who It Is For

  • Landscape contractors installing outdoor speaker and lighting conduit before hardscape
  • General contractors coordinating outdoor AV scope with landscape and MEP trades
  • Architects specifying outdoor technology infrastructure in construction documents
  • Homeowners planning covered outdoor living spaces with integrated audio and lighting

When To Use It

  • Before hardscape is designed so conduit stub-up positions align with furniture layouts
  • During landscape rough-in when conduit can be placed before concrete and stone
  • Before outdoor structure framing to verify speaker blocking and conduit routing
  • At commissioning to configure outdoor zones, scenes, and weather automation triggers

Read or Download the PDF

The full standard, including specifications, diagrams, and field references, is in the embedded PDF below. Read it inline or download it for your jobsite folder.

Your browser does not display embedded PDFs. Download Outdoor Living Standards (PDF).

Field Notes

Outdoor AV fails at the rough-in stage more often than at the equipment stage. Speaker placement that works acoustically for the coverage zone, conduit that is waterproofed at every termination, and enclosures with the correct IP rating for the environment are the decisions that determine whether the outdoor system is used or ignored.

The coordination window for outdoor infrastructure is narrow. The landscape contractor is moving through the site quickly, and adding conduit after hardscape is in place means breaking stone or concrete. We wrote this standard to give the GC a single document to hand to all outdoor trades before excavation begins.

Browse the Full Standards Library

Forty-six authored field manuals, one-pagers, and pre-wall standards. Free for trades, architects, and dealers across NJ, NY, and CT.

View All 46 PDFs