Skip to main content

Pre-Wire Standard

Pre-Pool Bonding Standard

The Restrepo standard for bonding all AV and automation metallic components in pool and spa environments. Defines NEC 680 bonding conductor requirements, tie-in positions for each component type, and the sign-off protocol before pool shell or deck installation.

What This Standard Covers

  • NEC 680 bonding conductor sizing and material requirements for pool and spa environments
  • Bonding tie-in positions for underwater speaker brackets, enclosures, and metallic conduit
  • Equipment room bonding requirements for metallic racks, panels, and enclosures near water
  • Above-deck bonding requirements for outdoor AV enclosures within the pool zone
  • Pool bonding inspection checklist for AV and automation components
  • Coordination with pool contractor and electrician for bonding conductor routing

Who It Is For

  • Pool contractors confirming all AV and automation bonding is complete before shell pour
  • Electricians performing pool bonding work who need a component list from the AV scope
  • AV integrators providing metallic component schedules to the electrical trade for bonding
  • General contractors managing pool inspection sign-off before deck installation

When To Use It

  • Before pool shell construction begins to establish bonding routing and component schedule
  • During shell construction to bond all metallic components before gunite is applied
  • Before deck installation to verify all above-deck AV bonding connections are made
  • At pool inspection to confirm all NEC 680 bonding requirements are satisfied

Read or Download the PDF

The full standard, including specifications, diagrams, and field references, is in the embedded PDF below. Read it inline or download it for your jobsite folder.

Your browser does not display embedded PDFs. Download Pre-Pool Bonding Standard (PDF).

Field Notes

Bonding is not optional and it is not the electrician's problem alone. Every metallic component that the AV integrator installs in the pool zone is the AV integrator's responsibility to identify and include in the bonding schedule. This standard defines the component list and the tie-in requirements.

The most common bonding miss on a pool AV project is an underwater speaker bracket that is not on the bonding conductor. The bracket ships without a bonding lug. The installer does not add one. The pool passes inspection because the inspector is not checking AV hardware. This standard closes that gap.

Browse the Full Standards Library

Forty-six authored field manuals, one-pagers, and pre-wall standards. Free for trades, architects, and dealers across NJ, NY, and CT.

View All 46 PDFs