Coordination drawings, load calculations, and equipment specifications that live inside your set.

Low-voltage that never made it onto your set, rack rooms sized without heat load, and equipment that shows up bigger than the drawing said.

  • Low-voltage infrastructure is treated as a specialty scope outside the coordinated set. Rack rooms, conduit paths, and equipment enclosures do not appear on the MEP drawings. Field coordination absorbs what should have been on paper.
  • Rack room square footage is set from a nominal figure. Actual equipment inventory, service access, and future capacity are not known. The room ends up too small, or oversized in the wrong direction.
  • HVAC heat load calculations do not include the AV equipment room. The rack runs hot, thermal shutdown becomes an owner complaint, and the mechanical engineer is asked to solve a problem the AV firm never disclosed.
  • Network infrastructure is scoped as if it were a single closet. Multi-floor pathway coordination, IDF room requirements, and equipment cooling for switches are not spec'd. The IT infrastructure fights the mechanical infrastructure.
  • Conduit paths for AV, controls, and low-voltage are added to the drawings after the mechanical and structural coordination is already done. The paths conflict with beams, ducts, and sprinklers. Rework starts.

We come to coordination meetings. Not to sales meetings. We bring our equipment schedule, our heat load, our conduit paths, and our network topology on your coordination sheets.

The AV scope belongs inside the coordinated set, not on a separate PDF that nobody opens until commissioning.

Where we fit into your engineering workflow.

We work with MEP and systems engineers on commercial, hospitality, and residential projects across NJ, NY, and CT. Our deliverables are drawings, schedules, and specifications that live inside your set.

01

Pre-Rack Attic-Inclusive Planning and Coordination

Before the rack room square footage is set, we produce a pre-rack coordination package: equipment inventory with cabinet counts, service clearances, expansion capacity, and cable pathways. That package goes to the architect and to the MEP engineer so the room is sized correctly and the pathway coordination starts on paper.

02

MEP Coordination Sheets

We produce coordination sheets that overlay onto your mechanical, electrical, and plumbing drawings: conduit paths, cable trays, rack room layouts, and low-voltage device positions. Sheets are sequenced against your revision schedule. When the mechanical or structural design shifts, we revise with the set, not against it.

03

Equipment Heat Load and Power Specifications

Every AV equipment room has a documented heat load and power spec. Total wattage, sensible heat rejection, redundancy requirements, and UPS runtime targets are provided in writing to the mechanical and electrical engineer. HVAC and panel sizing include the AV load from the first pass, not after the fact.

04

Network Infrastructure Sizing

Multi-floor network topology: IDF and MDF room requirements, patch panel counts, switch heat rejection, and cabling pathway sizing are worked out with the IT and MEP teams together. Cooling, power, and pathway needs for the network side of the project are documented against the rest of the infrastructure.

05

Conduit Paths in the Reflected Ceiling Plan

Conduit runs are drawn against your RCP and coordinated with the mechanical and structural systems. In-ceiling device locations, above-ceiling equipment, and pathway conflicts are resolved on paper before rough-in. We attend BIM coordination meetings when the project is set up for them.

06

Redundancy, UPS, and Backup Specifications

Business-critical systems get documented redundancy specs: UPS runtime, generator load, ATS integration, and switchover behavior. Owner-facing services -- video conferencing, distributed audio, control systems, network -- have documented failure modes and recovery paths. Nothing is left to be discovered at commissioning.

How coordination-drawing-ready AV changes the job.

These are real coordination outcomes on commercial and residential projects, presented without client names or addresses.

Midtown Manhattan -- Commercial Office Fit-Out

A Midtown fit-out had a 4,200 SF corporate floor with three conference rooms, a boardroom, an executive suite, and a distributed audio system. We joined the MEP coordination meeting at 65% CDs, produced overlay sheets for the AV conduit and rack power, and revised twice with the set. Commissioning ran without a single RFI on the AV infrastructure.

Ridgefield, CT -- Estate With Multi-Floor Network

A Ridgefield estate had a three-floor plus basement network topology, main rack, and two IDF closets. The mechanical engineer had not sized the IDF closets for heat rejection. We provided the heat load spec, the mechanical engineer revised the DX unit selection, and the network closets came online in temperature range at first commissioning.

Bergen County -- Commercial Retail Ownership Group

A commercial retail ownership group had a portfolio-standard rack room design that was undersized for the actual equipment load. We produced a revised rack room layout with correct heat load and power specifications. The mechanical and electrical engineers updated the portfolio template. Two subsequent buildouts opened without rack room heat complaints.

Mike Restrepo

Founder and Lead Integrator

Mike has worked with MEP and systems engineers on commercial, hospitality, and residential projects across NJ, NY, and CT for more than a decade. He treats AV infrastructure as an engineered scope, not a specialty add-on. Heat loads, panel schedules, conduit paths, and network topologies are documented against the coordinated set. When a coordination question comes up in a meeting, the answer is on the drawing, not in a follow-up email.

Direct Contact

201.405.2022
office@restrepoinnovations.com
599 Franklin Ave, Franklin Lakes, NJ 07417

The credentials below are the ones Restrepo Innovations holds. We work under the electrical contractor on high-voltage scope and coordinate directly with the MEP engineer of record.

  • Elite Pro Crestron Dealer -- the highest tier in Crestron's dealer program; means the control system that runs the shades, lighting, and AV is programmed and supported in-house by certified staff
  • HTA Luxury Certified -- Home Technology Association luxury-tier certification, the standard that leading design firms use to vet AV integrators on high-end residential projects
  • OSHA Certified -- full construction-site compliance for renovations and new builds; we work safely around finished surfaces and do not create damage that the design team has to fix
  • Ubiquiti UISP / Pro Partner -- professional network infrastructure that supports the consistent connectivity all modern control systems depend on

Projects across NJ, NY, and CT.

We work with engineers on projects across NJ, NY, and CT. Our service area covers the luxury corridor where most of the professionals we work with are based or have active projects.

New Jersey

Bergen, Essex, Morris,
Passaic and Hudson

Alpine, Saddle River, Franklin Lakes, Short Hills, Tenafly, Montclair, and surrounding luxury communities. Based in Franklin Lakes with active projects throughout NJ.

Connecticut

Fairfield and Litchfield
Counties

Greenwich, Darien, New Canaan, Westport, Stamford, Ridgefield, and surrounding Fairfield County communities. Also active in Litchfield County.

New York

Westchester, Manhattan
and the Hamptons

Westchester County, Manhattan co-ops, townhomes, and lofts, and select Hamptons projects.

Schedule a coordination review.

If you have a project at schematic design or design development and you want the AV scope coordinated into the set before CDs, call or email Mike directly. Coordination reviews are available at your office, on site, or remote. No project commitment is required. For engineers new to working with Restrepo Innovations, a 30-minute introductory call is available first.

Resources for engineers

Coordinate the infrastructure. Ship a coordinated set.

The AV scope belongs inside your coordinated set. These standards are what we deliver to the engineer of record before CDs go out for bid.

  • Pre-Rack AI Standard

    The pre-rack coordination package: equipment inventory, service clearances, expansion capacity, and pathways for the rack room.

  • AI Conference Room Standards

    Conference and boardroom AI standards: displays, cameras, DSP, control, and the mechanical and electrical they depend on.

  • Panels Standards

    Panel and enclosure construction with embedded technology. Substrate, fastening, and service clearances.

  • Rough-In Standards

    Low-voltage rough-in coordinated against MEP. Box locations, mud-ring depths, and conduit paths.

  • Envelope Standards

    Envelope penetrations for cabling: sizing, sealing, fire-stopping, and coordination with the structural and mechanical envelope.

  • Energy Standards

    Equipment energy and heat load: total wattage, sensible heat rejection, and mechanical coordination for AV rooms.

  • Panels Field Card

    Site card for panel construction. Substrate, fastening, and service access.

  • AI Conference Field Card

    Field card for the conference room AI install. Centerlines, sightlines, and the checks that prevent commissioning slip.

Real insights from real projects.

One or two emails a month. No fluff. Confirm via the link we email you and pick the divisions you actually care about on the full signup page.

Want to choose specific divisions? Use the full signup page.